Maintenance Planning

When it comes to necessary maintenance to rectify structural defects or on existing structures, the Building Materials Technology Competence Center will take on the entire planning of maintenance measures. We work by the following step-by-step approach:

  • Situation analysis – Stage 1
  • Maintenance concept – Stage 2
  • Maintenance planning – Stage 3
  • Monitoring/documentation – Stage 4

Current projects:

  • Faulenbach hydropower station (fire damage) (Stages 1, 2 and 3)
  • Renovation of Bottrop pumping station (Stages 1, 2, 3 and 4)
  • Hamitabat cooling tower (Stage 1)
  • Steag Voerde cooling tower (Stage 1)