Khurmala 300 MW CCPP Project Steam Tail

Project involves the EPCM works of:

4 heat recovery steam generators (HRSG) – Dual pressure, HP: 9.63 MPa – 72.4 kg/s; LP: 7.49 MPa - 15.79 kg/s,

2 steam turbine generators (STG) –136 MW at 20 kPa Condensing pressure,

2 air-cooled condensers (ACC),

All needed electrical and I&C equipment and balance of plant (BoP).

Planned capacity: 950 MW (650 + 300 MW)

Execution by Renaissance Heavy Industries