Rostock Central Station Tunnel

Rostock, Germany

Project:

New construction of a subway tunnel below Rostock Central Station serving as a modern stop and transfer point. Construction meanwhile ongoing train service. During the renewal of tracks, platforms and access structures on the surface (separate contract with DB AG), underground construction for passenger and subway levels was carried out in cut-and-cover method, platforms were built in open building method.

  • Ground excavation: 20,000 m³
  • Concrete: 60,000 m³
  • Reinforcement: 2,700 t

Client:

Rostocker Straßenbahn AG and
Deutsche Bahn AG


Planning:

BPI-Consult GmbH