Waste Treatment Plant TABA SIDOR Leudelange, Luxemburg

Leudelange, Luxemburg

Project:

Construction of structural facilities and secondary installations (including technical building equipment) for the waste treatment plant “SIDOR Leudelange” at the waste incineration plant MVA Leudelange, Luxemburg.


Client:

E.ON Energy from Waste Leudelange S.á.r.l. Leudelange, Luxemburg


Planning:

E.ON Energy from Waste, Saarbrücken


Construction time:

2008 - 2010