Gotthard Base Tunnel - Railway Engineering

  • Slab track: 2 x 57 km in the tunnel
  • Open track: 39 km of ballasted track
  • Points: 8 high-speed points & 8 open-track points
  • Load-bearing system: 380,000 LVT monoblocs

Construction timeframe

April 2008 - May 2016

Execution by Renaissance Construction Schweiz