New Track Cologne – Frankfurt, Lot 2.3 Siegburg

New Track Cologne – Frankfurt, Germany

Project:

Heitkamp was heavily involved with several lots along the Cologne - Frankfurt high speed track. Heitkamp was in charge in Siegburg on a section of 3.4 km length on the construction of a total of 7 bridges and 1 tunnel including the entire track section. The order included extensive renaturation measures which were meant to compensate for the areas required by the tracks.


Client:

DB Projekt GmbH


Planning:

Ingenieurbüro Vössing


Construction time:

1997 - 2003