1st Januar 2012 Zech Bau Holding GmbH, a company of Zech Group with headquarters in Bremen, integrates Heitkamp Ingenieur- und Kraftwerksbau GmbH. Zech Group will contribute its resources and know-how in order to position Heitkamp Ingenieur- und Kraftwerksbau GmbH to meet the challenges of the future. All ongoing projects will be continued, the core competencies in power plant and industrial construction as well as construction engineering are to be strengthened and expanded further. You can find the press release on the takeover here.
Project: Turnkey construction of an operational building (electronics, installations for feed water and generation of steam on site). The building technology for the operational building included the entire carcass from top edge, ridgepoles, pillars or pillar heads (steel construction, facade, roof, roof insulation masonry, locksmith work, doors and gates, paint work, earth and drainage work, drinking and extinguishing water, concreting work for exterior installations, roadwork including TGA / process measuring and control technology).
Client: DOW Deutschland Anlagengesellschaft mbH Werk Stade Planning: RBS wave GmbH, Esslingen Construction volume: €3.44 mn. Construction time: 2009 - 2010