Khurmala 300 MW CCPP Project Steam Tail

Project involves the EPCM works of:

4 Heat Recovery Steam Generators (HRSG) – Dual Pressure, HP: 9.63Mpa – 72.4kg/s; LP: 7.49MPa - 15.79kg/s,

2 Steam Turbine Generators (STG) –136 MW at 20 kPa Condensing Pressure,

2 Air Cooled Condensers (ACC),

all needed electrical and I&C equipment and Balance of Plant (BoP).

Planned Capacity: 950 MW (650 + 300 MW)

Execution by Renaissance Heavy Industries